top of page

72224 Ebhausen - Rotfelden

Project : 72224 Ebhausen - Rotfelden

Schwarzenbachmühle footbridge and cycle bridge

 

Year of construction : 2025


Total length : 7.43 m


Clear width : 2.10 m


Payload : 5kN/m² with increased load capacity for municipal vehicles up to 3.5 tonnes gross vehicle weight


Bridge decking : Carbon concrete (CPC) with building authority approval – slip resistance class R12


Railings : 3.856m and 2.194m, infill bar railing made of duplex stainless steel


Construction : bolted beam bridge


Surface : no surface protection necessary

20251111_124424.jpg
bottom of page