top of page

04720 Döbeln – Großbauchlitz

Project : 04720 Döbeln – Großbauchlitz
Foot and cycle bridge Muldental cycle route

 

Year of construction : 2025


Total length : 9.40 m


Clear width : 3.00 m


Payload : 5kN/m² with increased load capacity for municipal vehicles up to 7.5 tonnes gross vehicle weight


Bridge decking : GRP planks with building authority approval – slip resistance class R13


Railing : 9.95m, infill bar railing made of duplex stainless steel


Construction : bolted beam bridge


Surface : no surface protection necessary

Installation of duplex stainless steel bridge
bottom of page