top of page
04720 Döbeln – Großbauchlitz
Project : 04720 Döbeln – Großbauchlitz
Foot and cycle bridge Muldental cycle route
Year of construction : 2025
Total length : 9.40 m
Clear width : 3.00 m
Payload : 5kN/m² with increased load capacity for municipal vehicles up to 7.5 tonnes gross vehicle weight
Bridge decking : GRP planks with building authority approval – slip resistance class R13
Railing : 9.95m, infill bar railing made of duplex stainless steel
Construction : bolted beam bridge
Surface : no surface protection necessary


bottom of page








